{"id":185,"date":"2026-10-14T18:39:54","date_gmt":"2026-10-14T16:39:54","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=185"},"modified":"2026-10-20T17:49:46","modified_gmt":"2026-10-20T15:49:46","slug":"pasajul-solventului-intra-intr-o-noua-etapa","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/10\/14\/pasajul-solventului-intra-intr-o-noua-etapa\/","title":{"rendered":"Pasajul Solventului intr\u0103 \u00eentr-o nou\u0103 etap\u0103"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"678\" height=\"452\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/images-1.jpg\" alt=\"\" class=\"wp-image-391\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/images-1.jpg 678w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/images-1-300x200.jpg 300w\" sizes=\"auto, (max-width: 678px) 100vw, 678px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Prim\u0103ria Municipiului Timi\u0219oara a anun\u021bat avansarea lucr\u0103rilor la <strong>Pasajul Solventul<\/strong>, unul dintre cele mai importante proiecte de infrastructur\u0103 urban\u0103 aflate \u00een execu\u021bie, odat\u0103 cu \u00eenceperea mont\u0103rii aparatelor de cale necesare integr\u0103rii re\u021belei de tramvai \u00een noul coridor de transport.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Potrivit administra\u021biei locale, echipele constructorului lucreaz\u0103 \u00een prezent la instalarea aparatelor de cale, etap\u0103 care va fi urmat\u0103 de montarea sistemelor de automatizare \u0219i comand\u0103 necesare exploat\u0103rii \u00een siguran\u021b\u0103 a infrastructurii.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen paralel, continu\u0103 lucr\u0103rile la:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>liniile de tramvai;<\/li>\n\n\n\n<li>infrastructura aferent\u0103 c\u0103ii de rulare;<\/li>\n\n\n\n<li>finisajele pasajului;<\/li>\n\n\n\n<li>amenaj\u0103rile necesare punerii \u00een func\u021biune a noii conexiuni.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Un proiect strategic pentru transportul public din vestul ora\u0219ului<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pasajul Solventul este conceput pentru a elimina una dintre principalele bariere de mobilitate din zona de vest a Timi\u0219oarei \u0219i pentru a asigura continuitatea re\u021belei de tramvai peste culoarul feroviar.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prin integrarea noii infrastructuri, municipalitatea urm\u0103re\u0219te:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u00eentregirea re\u021belei de tramvai din partea vestic\u0103 a ora\u0219ului;<\/li>\n\n\n\n<li>cre\u0219terea atractivit\u0103\u021bii transportului public;<\/li>\n\n\n\n<li>reducerea timpilor de deplasare;<\/li>\n\n\n\n<li>\u00eembun\u0103t\u0103\u021birea conexiunilor dintre cartierele aflate de o parte \u0219i de alta a c\u0103ii ferate.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Montarea aparatelor de cale reprezint\u0103 una dintre etapele esen\u021biale \u00eenainte de realizarea probelor tehnice \u0219i a punerii \u00een func\u021biune a infrastructurii de tramvai.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Odat\u0103 finalizat, Pasajul Solventul va deveni unul dintre cele mai importante noduri de transport din Timi\u0219oara, contribuind at\u00e2t la fluidizarea traficului rutier, c\u00e2t \u0219i la dezvoltarea transportului public electric.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sursa: <a href=\"https:\/\/www.facebook.com\/primariatm?__cft__[0]=AZj4E9cNT5g1-WhLR91Q0l0juB5JbhcUH3x9K6lvmNhjLHf7jgf0c7f7s87JkA135C6P0ChKtlopUP2eqAlG4MjECqUlQc7ppNpOLcJ65HN_vt-bul0bEjI-x5ZAZl7e00eTv3PRe90&amp;__tn__=-UC%2CP-R\"><strong>Prim\u0103ria Municipiului Timi\u0219oara<\/strong><\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Prim\u0103ria Municipiului Timi\u0219oara a anun\u021bat avansarea lucr\u0103rilor la Pasajul Solventul, unul dintre cele mai importante proiecte de infrastructur\u0103 urban\u0103 aflate \u00een execu\u021bie, odat\u0103 cu \u00eenceperea mont\u0103rii aparatelor de cale necesare integr\u0103rii re\u021belei de tramvai \u00een noul coridor de transport. Potrivit administra\u021biei locale, echipele constructorului lucreaz\u0103 \u00een prezent la instalarea aparatelor de cale, etap\u0103 care va [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-185","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/185","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=185"}],"version-history":[{"count":2,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/185\/revisions"}],"predecessor-version":[{"id":392,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/185\/revisions\/392"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=185"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=185"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=185"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}