{"id":506,"date":"2026-10-22T00:07:53","date_gmt":"2026-10-21T22:07:53","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=506"},"modified":"2026-10-22T00:32:45","modified_gmt":"2026-10-21T22:32:45","slug":"lansare-tbm-pe-sectiunea-nordica-a-magistralei-m6","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/10\/22\/lansare-tbm-pe-sectiunea-nordica-a-magistralei-m6\/","title":{"rendered":"\u00a0Metrorex a b\u0103gat \u00een p\u0103m\u00e2nt Sf. Parascheva \u0219i Ecaterina, sfintele ma\u0219ini de forare a tunelului c\u0103tre Otopeni"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"577\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/857070598_1174978221626670_324874654729785134_n-1024x577.jpg\" alt=\"\" class=\"wp-image-507\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/857070598_1174978221626670_324874654729785134_n-1024x577.jpg 1024w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/857070598_1174978221626670_324874654729785134_n-300x169.jpg 300w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/857070598_1174978221626670_324874654729785134_n-767x432.jpg 767w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/857070598_1174978221626670_324874654729785134_n.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Unul dintre cele dou\u0103 TBM destinate s\u0103p\u0103rii tunelurilor de metrou pe sec\u021biunea nordic\u0103 a M6 \u0219i-a \u00eenceput treaba, dup\u0103 ce a fost botezat\u0103 de un sobor de preo\u021bi.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/clubferoviar.ro\/magistrala-6-de-metrou-santier-lucrari\/\" target=\"_blank\" rel=\"noopener\">Proiectul metroului spre Otopeni<\/a> a intrat miercuri \u00eentr-o nou\u0103 etap\u0103 important\u0103 pentru construc\u021bia Magistralei M6 de metrou, pornind unul dintre cele dou\u0103 utilaje TBM (primul Sf. Parascheva, al doilea Sf. Ecaterina) pentru forarea tunelurilor pe sec\u021biunea dintre Sta\u021bia Tokyo \u0219i Aeroportul Otopeni.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Forajul pe aceast\u0103 sec\u021biune, Sec\u021biunea de Nord, se va desf\u0103\u0219ura \u00een 2 etape:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>\u00eencep\u00e2nd de la viitoarea sta\u021bie Bruxelles spre sta\u021bia Tokyo (punctul de leg\u0103tur\u0103 cu Sec\u021biunea de Sud a M6);<\/li>\n\n\n\n<li>\u00een etapa a 2-a utilajele vor fi relansate de la sta\u021bia Bruxelles spre Aeroportul Otopeni.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Sec\u021biunea Sud a Magistralei are 6 sta\u021bii de metrou \u0219i a ajuns la un stadiu fizic de 78%. Sec\u021biunea de Nord va avea la r\u00e2ndul ei tot 6 sta\u021bii. \u0218i are acum un progres stadiu fizic de 34%. \u00centreaga Magistral\u0103 6 de metrou de aproximativ 14 km ar trebui finalizat\u0103 \u00een prima partea a anului 2029.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Cine face lucr\u0103rile<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Sta\u021bia Bruxelles, unde sunt introduse TBM, este amplasat\u0103 \u00een laterala estic\u0103 a \u0218oselei Bucure\u0219ti \u2013 Ploie\u0219ti, \u00een zona de Nord-Est a intersec\u021biei dintre \u0218oseaua Bucure\u0219ti \u2013 Ploie\u0219ti \u015fi Linia de Centur\u0103 (D.N.C.B.). Sta\u021bia Bruxelles reprezint\u0103 pu\u021bul de lansare, din care se vor lansa TBM-urile, pentru fiecare dintre cele dou\u0103 direc\u021bii. Aceast\u0103 sta\u021bie va fi dotat\u0103 cu dou\u0103 accesuri, o galerie, precum \u0219i o parcare situat\u0103 \u00een zona verde adiacent\u0103. \u00cen\u0103l\u021bimea parc\u0103rii este D+P+1E+teras\u0103 circulabil\u0103. Sta\u021bia Bruxelles are o lungime de 295 m, din care 146,3 m sunt destina\u021bi zonei de manevr\u0103 din cap\u0103tul nordic, \u0219i o l\u0103\u021bime maxim\u0103 de 28,27 m.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Antreprenor general pentru Sec\u021biunea Sud este asocierea Alsim Alarko \u2013 Makyol, iar supervizorul proiectului, asocierea Padeco Co., Ltd. \u2013 Oriental Consultants Global Co., Ltd. \u2013 Metroul SA. Sec\u021biunea are un traseu de 6,6 km \u0219i, pe l\u00e2ng\u0103 sta\u021bia 1 Mai (existent\u0103), cuprinde 6 sta\u021bii: Pajura, Expozi\u021biei, Pia\u021ba Montreal, Gara B\u0103neasa, Aeroport B\u0103neasa \u0219i Tokyo. Contractul de execu\u021bie are valoarea de 1,2 miliarde lei (f\u0103r\u0103 TVA). Lucr\u0103rile au \u00eenceput \u00een decembrie 2023 \u0219i se estimeaz\u0103 c\u0103 vor fi finalizate p\u00e2n\u0103 \u00een anul 2028.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Antreprenor general al lucr\u0103rilor pe Sec\u021biunea Nord este asocierea G\u00fclermak A\u011fir Sanayi Insaat ve Taahh\u00fct AS \u2013 Somet SA, iar proiectan\u021bi sunt 3TI Progetti \u0219i TPF Ingenieria.<br>Proiectarea \u0219i execu\u021bia Sec\u021biunii Nord a Magistralei 6 sunt finan\u021bate de la bugetul de stat \u0219i din fonduri externe rambursabile, prin creditul acordat de JICA \u2013 Japan International Cooperation Agency.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sursa info: Club Feroviar<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sursa foto: Asocia\u021bia Pro Infrastructur\u0103.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Unul dintre cele dou\u0103 TBM destinate s\u0103p\u0103rii tunelurilor de metrou pe sec\u021biunea nordic\u0103 a M6 \u0219i-a \u00eenceput treaba, dup\u0103 ce a fost botezat\u0103 de un sobor de preo\u021bi. Proiectul metroului spre Otopeni a intrat miercuri \u00eentr-o nou\u0103 etap\u0103 important\u0103 pentru construc\u021bia Magistralei M6 de metrou, pornind unul dintre cele dou\u0103 utilaje TBM (primul Sf. Parascheva, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-506","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/506","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=506"}],"version-history":[{"count":3,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/506\/revisions"}],"predecessor-version":[{"id":510,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/506\/revisions\/510"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=506"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=506"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=506"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}