{"id":579,"date":"2026-10-23T20:46:42","date_gmt":"2026-10-23T18:46:42","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=579"},"modified":"2026-10-23T20:46:42","modified_gmt":"2026-10-23T18:46:42","slug":"bawi-construction-avanseaza-cu-lucrarile-de-electrificare-pe-coridorul-rin-dunare-si-in-portul-constanta","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/10\/23\/bawi-construction-avanseaza-cu-lucrarile-de-electrificare-pe-coridorul-rin-dunare-si-in-portul-constanta\/","title":{"rendered":"Bawi Construction avanseaz\u0103 cu lucr\u0103rile de electrificare pe Coridorul Rin\u2013Dun\u0103re \u0219i \u00een Portul Constan\u021ba"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"470\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/861214751_1601510941673698_5968088969867836185_n.webp\" alt=\"\" class=\"wp-image-580\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/861214751_1601510941673698_5968088969867836185_n.webp 780w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/861214751_1601510941673698_5968088969867836185_n-300x181.jpg 300w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/861214751_1601510941673698_5968088969867836185_n-767x462.jpg 767w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Compania <strong>Bawi Construction<\/strong> a prezentat stadiul lucr\u0103rilor desf\u0103\u0219urate prin departamentele sale de <strong>Electrificare Vest<\/strong> \u0219i <strong>Electrificare Sud<\/strong>, \u00een cadrul unor proiecte importante de modernizare a infrastructurii feroviare din vestul \u0219i sud-estul Rom\u00e2niei.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Activit\u0103\u021bile vizeaz\u0103 at\u00e2t montarea noilor instala\u021bii de electrificare, c\u00e2t \u0219i demontarea echipamentelor existente pe sec\u021biunile aflate \u00een modernizare.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Lucr\u0103ri intense pe tronsonul Lugoj \u2013 Arad<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Pe sec\u021biunile care fac parte din modernizarea magistralei feroviare dintre <strong>Lugoj, Timi\u0219oara \u0219i Arad<\/strong>, echipele Bawi Construction desf\u0103\u0219oar\u0103 lucr\u0103ri la infrastructura sistemului de alimentare cu energie electric\u0103 a trenurilor.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pe <strong>Lotul 2 (Lugoj \u2013 Timi\u0219oara Est)<\/strong> se execut\u0103:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>montarea st\u00e2lpilor, ancorelor \u0219i funda\u021biilor pentru linia de contact;<\/li>\n\n\n\n<li>instalarea ansamblurilor de catenar\u0103;<\/li>\n\n\n\n<li>realizarea protec\u021biilor electrice colective \u0219i individuale ale elementelor metalice.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Pe <strong>Lotul 3 (Timi\u0219oara Est \u2013 Rona\u021b + Grupa D)<\/strong> sunt \u00een desf\u0103\u0219urare:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>lucr\u0103ri de demontare a instala\u021biilor existente de linie de contact;<\/li>\n\n\n\n<li>montarea noilor structuri de sus\u021binere \u0219i electrificare.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Pe <strong>Lotul 4 (Rona\u021b \u2013 Arad)<\/strong> activitatea include:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>demontarea vechii infrastructuri de electrificare;<\/li>\n\n\n\n<li>eliminarea provizoratelor existente;<\/li>\n\n\n\n<li>montarea noilor st\u00e2lpi, funda\u021bii \u0219i ansambluri de catenar\u0103;<\/li>\n\n\n\n<li>realizarea instala\u021biilor provizorii necesare men\u021binerii traficului pe durata lucr\u0103rilor.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Moderniz\u0103ri \u0219i \u00een zona Constan\u021ba<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Prin departamentul <strong>Electrificare Sud<\/strong>, compania lucreaz\u0103 \u0219i la proiectele:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Valu lui Traian \u0219i Grupa de A\u0219teptare<\/strong>;<\/li>\n\n\n\n<li><strong>Port Constan\u021ba 2<\/strong>.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">La <strong>Valu lui Traian<\/strong> sunt executate lucr\u0103ri de montare a ansamblurilor de catenar\u0103 \u0219i a sistemelor de protec\u021bie electric\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen cadrul proiectului <strong>Port Constan\u021ba 2<\/strong>, echipele desf\u0103\u0219oar\u0103:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>demontarea elementelor existente ale liniei de contact;<\/li>\n\n\n\n<li>demontarea st\u00e2lpilor \u0219i funda\u021biilor vechi;<\/li>\n\n\n\n<li>montarea noilor structuri de electrificare.<\/li>\n<\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Investi\u021bii esen\u021biale pentru cre\u0219terea capacit\u0103\u021bii feroviare<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Lucr\u0103rile fac parte din programele de modernizare a infrastructurii feroviare na\u021bionale \u0219i contribuie la:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>cre\u0219terea vitezelor de circula\u021bie;<\/li>\n\n\n\n<li>\u00eembun\u0103t\u0103\u021birea fiabilit\u0103\u021bii aliment\u0103rii electrice;<\/li>\n\n\n\n<li>reducerea costurilor de exploatare;<\/li>\n\n\n\n<li>dezvoltarea transportului feroviar de c\u0103l\u0103tori \u0219i marf\u0103;<\/li>\n\n\n\n<li>cre\u0219terea competitivit\u0103\u021bii coridoarelor feroviare rom\u00e2ne\u0219ti.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">\u00cen special pe rela\u021bia <strong>Arad \u2013 Timi\u0219oara \u2013 Lugoj<\/strong>, modernizarea instala\u021biilor de electrificare reprezint\u0103 o component\u0103 esen\u021bial\u0103 a coridorului european <strong>Rin\u2013Dun\u0103re<\/strong>, una dintre cele mai importante axe feroviare ale re\u021belei TEN-T.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Foto &amp; info: Bawi Construction<\/strong><ins><\/ins><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania Bawi Construction a prezentat stadiul lucr\u0103rilor desf\u0103\u0219urate prin departamentele sale de Electrificare Vest \u0219i Electrificare Sud, \u00een cadrul unor proiecte importante de modernizare a infrastructurii feroviare din vestul \u0219i sud-estul Rom\u00e2niei. Activit\u0103\u021bile vizeaz\u0103 at\u00e2t montarea noilor instala\u021bii de electrificare, c\u00e2t \u0219i demontarea echipamentelor existente pe sec\u021biunile aflate \u00een modernizare. Lucr\u0103ri intense pe tronsonul Lugoj [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-579","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=579"}],"version-history":[{"count":1,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/579\/revisions"}],"predecessor-version":[{"id":581,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/579\/revisions\/581"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}