{"id":629,"date":"2026-10-28T00:02:03","date_gmt":"2026-10-27T22:02:03","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=629"},"modified":"2026-10-28T00:02:03","modified_gmt":"2026-10-27T22:02:03","slug":"electrificarea-liniei-darmanesti-vicsani-atinge-20-progres-fizic-investitie-de-576-milioane-de-euro-pe-coridorul-baltica-marea-neagra-marea-egee","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/10\/28\/electrificarea-liniei-darmanesti-vicsani-atinge-20-progres-fizic-investitie-de-576-milioane-de-euro-pe-coridorul-baltica-marea-neagra-marea-egee\/","title":{"rendered":"Electrificarea liniei D\u0103rm\u0103ne\u0219ti \u2013 Vic\u0219ani atinge 20% progres fizic. Investi\u021bie de 57,6 milioane de euro pe coridorul Baltic\u0103 \u2013 Marea Neagr\u0103 \u2013 Marea Egee"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"780\" height=\"470\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1793076479031.webp\" alt=\"\" class=\"wp-image-630\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1793076479031.webp 780w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1793076479031-300x181.jpg 300w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1793076479031-767x462.jpg 767w\" sizes=\"auto, (max-width: 780px) 100vw, 780px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">Contractul pentru electrificarea tronsonului feroviar <strong>D\u0103rm\u0103ne\u0219ti \u2013 Vic\u0219ani<\/strong>, unul dintre proiectele importante de infrastructur\u0103 feroviar\u0103 din nordul Rom\u00e2niei, a ajuns la un stadiu de execu\u021bie de <strong>20% progres fizic<\/strong>, potrivit informa\u021biilor prezentate de Claudiu Staicu, manager de programe de fonduri europene \u00een cadrul Ministerului Transporturilor \u0219i Infrastructurii.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sec\u021biunea, cu o lungime de <strong>30,3 kilometri<\/strong>, este amplasat\u0103 pe coridorul multimodal <strong>Baltic\u0103 \u2013 Marea Neagr\u0103 \u2013 Marea Egee (BBA)<\/strong> \u0219i are un rol strategic \u00een consolidarea conectivit\u0103\u021bii feroviare pe direc\u021bia nord-sud, facilit\u00e2nd leg\u0103turile dintre Ucraina, Rom\u00e2nia \u0219i re\u021beaua feroviar\u0103 european\u0103.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Valoarea total\u0103 a proiectului este de aproximativ <strong>57,6 milioane de euro<\/strong>, dintre care <strong>24,38 milioane de euro<\/strong> sunt asigurate prin finan\u021bare european\u0103 \u00een cadrul programului <strong>CEF \u2013 Connecting Europe Facility<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implementarea investi\u021biei va permite \u00eembun\u0103t\u0103\u021birea opera\u021biunilor feroviare transfrontaliere \u0219i cre\u0219terea eficien\u021bei transportului de marf\u0103 \u0219i c\u0103l\u0103tori pe una dintre cele mai importante leg\u0103turi feroviare dintre Rom\u00e2nia \u0219i Ucraina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Electrificarea tronsonului D\u0103rm\u0103ne\u0219ti \u2013 Vic\u0219ani reprezint\u0103 una dintre m\u0103surile-cheie pentru dezvoltarea coridorului BBA, contribuind la cre\u0219terea capacit\u0103\u021bii infrastructurii, reducerea costurilor de operare \u0219i \u00eembun\u0103t\u0103\u021birea sustenabilit\u0103\u021bii transportului feroviar interna\u021bional.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Proiectul se \u00eenscrie \u00een seria investi\u021biilor destinate moderniz\u0103rii infrastructurii feroviare rom\u00e2ne\u0219ti \u0219i consolid\u0103rii rolului \u021b\u0103rii \u00een fluxurile logistice europene \u0219i regionale, \u00een special \u00een contextul dezvolt\u0103rii transportului dintre Uniunea European\u0103 \u0219i Ucraina.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Foto&amp;info:<\/strong> Claudiu Staicu \u2013 Ministerul Transporturilor \u0219i Infrastructurii.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Contractul pentru electrificarea tronsonului feroviar D\u0103rm\u0103ne\u0219ti \u2013 Vic\u0219ani, unul dintre proiectele importante de infrastructur\u0103 feroviar\u0103 din nordul Rom\u00e2niei, a ajuns la un stadiu de execu\u021bie de 20% progres fizic, potrivit informa\u021biilor prezentate de Claudiu Staicu, manager de programe de fonduri europene \u00een cadrul Ministerului Transporturilor \u0219i Infrastructurii. Sec\u021biunea, cu o lungime de 30,3 kilometri, este [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-629","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/629","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=629"}],"version-history":[{"count":1,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/629\/revisions"}],"predecessor-version":[{"id":631,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/629\/revisions\/631"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=629"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=629"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=629"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}