{"id":717,"date":"2026-11-03T18:42:48","date_gmt":"2026-11-03T16:42:48","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=717"},"modified":"2026-11-03T18:42:48","modified_gmt":"2026-11-03T16:42:48","slug":"irc-primeste-al-doilea-tren-alstom-in-doua-zile","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/11\/03\/irc-primeste-al-doilea-tren-alstom-in-doua-zile\/","title":{"rendered":"IRC prime\u0219te al doilea tren Alstom \u00een dou\u0103 zile"},"content":{"rendered":"\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"575\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1.03.2026-18-1-of-1-1024x575.jpg\" alt=\"\" class=\"wp-image-321\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1.03.2026-18-1-of-1-1024x575.jpg 1024w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1.03.2026-18-1-of-1-300x168.jpg 300w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1.03.2026-18-1-of-1-767x431.jpg 767w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/10\/1.03.2026-18-1-of-1.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Reprezentan\u021bii ARF \u2013 EGIS \u2013 ALSTOM au efectuat mar\u021bi recep\u021bia pentru punerea \u00een serviciul comercial cu c\u0103l\u0103tori a ramei electrice RE-IR de tip Coradia Stream \u2013 TS24, la Depoul Alstom, situat \u00een incinta Atelierelor CFR Grivi\u021ba.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Unitatea TS24 reprezint\u0103 trenul electric interregional cu num\u0103rul 24 construit \u0219i furnizat de produc\u0103torul francez Alstom, \u00een cadrul Contractului nr. RUIC 257\/2022, cod SMIS 316400, \u00eencheiat de Autoritatea pentru Reform\u0103 Feroviar\u0103 (ARF) cu Alstom Ferroviaria S.p.A., ce prevede furnizarea a 37 de astfel de rame electrice interregionale noi RE-IR, potrivit unui comunicat ARF.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Rama a fost predat\u0103<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Totodat\u0103, ARF a predat spre administrare rama electric\u0103 interregional\u0103 RE-IR TS24 c\u0103tre operatorul de transport feroviar InterRegional C\u0103l\u0103tori, care este cea de a 11-a unitate ce face parte din lotul celor 13 trenuri atribuite de ARF, \u00een cadrul CSP-L2 RUIC 1\/2026, aprobat prin HG nr. 1178\/2025.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><a href=\"https:\/\/clubferoviar.ro\/irc-tren-alstom-coradia-stream\/\" target=\"_blank\" rel=\"noopener\"><strong>Reamintim c\u0103 luni ARF a predat tot IRC al zecelea tren.<\/strong><\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Rute<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Cele patru rute de circula\u021bie pe care urmeaz\u0103 s\u0103 circule aceste trenuri sunt:<br>\u2022 Bucure\u0219ti Nord \u2013 Bra\u0219ov \u2013 Cluj Napoca;<br>\u2022 Bucure\u0219ti Nord \u2013 Bra\u0219ov;<br>\u2022 Bra\u0219ov \u2013 Deda \u2013 Cluj Napoca;<br>\u2022 Cluj Napoca \u2013 Deva \u2013 Timi\u0219oara Nord.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Achizi\u021bia face parte dintr-un proiect fazat, ce are ca Autoritate de Management \u2013 Ministerul Transporturilor \u0219i Infrastructurii, este derulat \u00een dou\u0103 etape succesive:prima etap\u0103 a fost finan\u021bat\u0103 prin Programul Opera\u021bional Infrastructur\u0103 Mare (POIM) 2014-2020 (<a href=\"https:\/\/arf.gov.ro\/web\/wp-content\/uploads\/2022\/10\/prezentare-achizitie-RE-IR.pdf\">https:\/\/arf.gov.ro\/web\/wp-content\/uploads\/2022\/10\/prezentare-achizitie-RE-IR.pdf<\/a>);<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>a doua etap\u0103 este cofinan\u021bat\u0103 prin Programul Transport (PT) 2021\u00f72027.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Perioada de implementare a proiectului este de 24 de luni (01.01.2024 \u00f7 31.12.2025).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Principalele rezultate \u0219i impactul proiectului la nivelul comunit\u0103\u021bii includ:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>eficientizarea \u0219i \u00eembun\u0103t\u0103\u021birea calit\u0103\u021bii serviciilor publice, oferite \u00een cadrul transportului public feroviar de c\u0103l\u0103tori pe rute inter-regionale;<\/li>\n\n\n\n<li>atribuirea contractelor de servicii publice pentru transportul feroviar de c\u0103l\u0103tori tuturor operatorilor licen\u021bia\u021bi, \u00een condi\u021biile legii \u0219i \u00een conformitate cu reglement\u0103rile europene privind serviciile publice \u00een domeniul transporturilor.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Obiectivul principal al proiectului \u00een constituie conectarea capitalei cu principalele centre urbane ale \u021b\u0103rii, contribuind la asigurarea mobilit\u0103\u021bii, la sc\u0103derea timpilor de c\u0103l\u0103torie \u0219i la \u00eembun\u0103t\u0103\u021birea nivelului general al serviciilor publice prestate pentru transportul public pe calea ferat\u0103.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Date financiare<\/strong><\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Valoarea total\u0103 a proiectului este de 1.708.996.863,41 lei, finan\u021barea fiind distribuit\u0103 dup\u0103 cum urmeaz\u0103:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>213.523.359,27 lei \u2013 valoarea eligibil\u0103 nerambursabil\u0103 din partea fondurilor( FEDR);<\/li>\n\n\n\n<li>151.181,05 lei \u2013 bugetul propriu al beneficiarului;<\/li>\n\n\n\n<li>322.323,09 lei \u2013 cheltuieli neeligibile, inclusiv TVA.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Reprezentan\u021bii ARF \u2013 EGIS \u2013 ALSTOM au efectuat mar\u021bi recep\u021bia pentru punerea \u00een serviciul comercial cu c\u0103l\u0103tori a ramei electrice RE-IR de tip Coradia Stream \u2013 TS24, la Depoul Alstom, situat \u00een incinta Atelierelor CFR Grivi\u021ba. Unitatea TS24 reprezint\u0103 trenul electric interregional cu num\u0103rul 24 construit \u0219i furnizat de produc\u0103torul francez Alstom, \u00een cadrul Contractului [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-717","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/717","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=717"}],"version-history":[{"count":1,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/717\/revisions"}],"predecessor-version":[{"id":718,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/717\/revisions\/718"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=717"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=717"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=717"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}