{"id":769,"date":"2026-11-05T23:57:17","date_gmt":"2026-11-05T21:57:17","guid":{"rendered":"https:\/\/ptbrb.ro\/?p=769"},"modified":"2026-11-05T23:57:17","modified_gmt":"2026-11-05T21:57:17","slug":"lucrarile-la-linia-de-tramvai-din-copou-au-ajuns-in-rond-triumf-dupa-doua-luni-de-santier","status":"publish","type":"post","link":"https:\/\/ptbrb.ro\/index.php\/2026\/11\/05\/lucrarile-la-linia-de-tramvai-din-copou-au-ajuns-in-rond-triumf-dupa-doua-luni-de-santier\/","title":{"rendered":"Lucr\u0103rile la linia de tramvai din Copou au ajuns \u00een Rond Triumf dup\u0103 dou\u0103 luni de \u0219antier"},"content":{"rendered":"\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"559\" height=\"421\" src=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/11\/Screenshot_5-11-2026_12424_www.facebook.com_.webp\" alt=\"\" class=\"wp-image-770\" srcset=\"https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/11\/Screenshot_5-11-2026_12424_www.facebook.com_.webp 559w, https:\/\/ptbrb.ro\/wp-content\/uploads\/2026\/11\/Screenshot_5-11-2026_12424_www.facebook.com_-300x226.jpg 300w\" sizes=\"auto, (max-width: 559px) 100vw, 559px\" \/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Compania de Transport Public Ia\u0219i (CTP Ia\u0219i)<\/strong> a anun\u021bat c\u0103 lucr\u0103rile de modernizare a liniei de tramvai de pe tronsonul <strong>Biblioteca Central\u0103 Universitar\u0103 (BCU) \u2013 Rond Triumf<\/strong> avanseaz\u0103 \u00eentr-un ritm sus\u021binut, utilajele \u0219i echipele de lucru ajung\u00e2nd deja \u00een zona Rond Triumf la doar dou\u0103 luni de la deschiderea \u0219antierului, pe 2 septembrie 2026.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Potrivit operatorului, progresul este vizibil pe \u00eentregul traseu, unde au fost executate p\u00e2n\u0103 acum o serie de lucr\u0103ri esen\u021biale pentru realizarea noii infrastructuri:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>consolidarea funda\u021biei c\u0103ii de rulare;<\/li>\n\n\n\n<li>construirea zidurilor de sprijin din beton;<\/li>\n\n\n\n<li>lucr\u0103ri de excavare;<\/li>\n\n\n\n<li>lucr\u0103ri de asfaltare;<\/li>\n\n\n\n<li>amenajarea \u0219i preg\u0103tirea sistemelor de drenaj.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Pentru accelerarea ritmului de execu\u021bie \u0219i limitarea impactului asupra traficului rutier, interven\u021biile se desf\u0103\u0219oar\u0103 inclusiv pe timpul nop\u021bii.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Investi\u021bie strategic\u0103 pentru transportul public din Ia\u0219i<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Modernizarea liniei de tramvai din zona Copou reprezint\u0103 una dintre cele mai importante investi\u021bii recente \u00een infrastructura de transport public a municipiului Ia\u0219i.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Prin reabilitarea complet\u0103 a c\u0103ii de rulare, autorit\u0103\u021bile urm\u0103resc:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>cre\u0219terea siguran\u021bei circula\u021biei tramvaielor;<\/li>\n\n\n\n<li>reducerea timpilor de c\u0103l\u0103torie;<\/li>\n\n\n\n<li>\u00eembun\u0103t\u0103\u021birea confortului pasagerilor;<\/li>\n\n\n\n<li>cre\u0219terea fiabilit\u0103\u021bii transportului public.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">Ajungerea lucr\u0103rilor \u00een zona Rond Triumf marcheaz\u0103 una dintre etapele importante ale \u0219antierului \u0219i confirm\u0103 avansarea proiectului pe una dintre cele mai circulate axe de transport public ale ora\u0219ului.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">CTP Ia\u0219i a mul\u021bumit locuitorilor pentru r\u0103bdarea manifestat\u0103 pe durata lucr\u0103rilor \u0219i a subliniat c\u0103 fiecare etap\u0103 finalizat\u0103 aduce ora\u0219ul mai aproape de o infrastructur\u0103 modern\u0103 \u0219i adaptat\u0103 cerin\u021belor actuale de mobilitate.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Foto&amp;info:<\/strong> Compania de Transport Public Ia\u0219i.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Compania de Transport Public Ia\u0219i (CTP Ia\u0219i) a anun\u021bat c\u0103 lucr\u0103rile de modernizare a liniei de tramvai de pe tronsonul Biblioteca Central\u0103 Universitar\u0103 (BCU) \u2013 Rond Triumf avanseaz\u0103 \u00eentr-un ritm sus\u021binut, utilajele \u0219i echipele de lucru ajung\u00e2nd deja \u00een zona Rond Triumf la doar dou\u0103 luni de la deschiderea \u0219antierului, pe 2 septembrie 2026. Potrivit [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-769","post","type-post","status-publish","format-standard","hentry","category-ptbr_bucuresti-news-national"],"_links":{"self":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/769","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/comments?post=769"}],"version-history":[{"count":1,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/769\/revisions"}],"predecessor-version":[{"id":771,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/posts\/769\/revisions\/771"}],"wp:attachment":[{"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/media?parent=769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/categories?post=769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ptbrb.ro\/index.php\/wp-json\/wp\/v2\/tags?post=769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}